We are trying to solve that, and not by having a scale in our exhibition space but making the soles even more solid. Stig taught us how to use the "shrinking cable" for that. We are also tapeing a lot which is good.
This is the recipie for the soles:
- 1 swedish crown
- 1 phonecable (6 m)
- "Shrinking cable"
- Tape
- Switch buttons (4,3 mm)
- Silicon pads (party feet)
This is our schedule for the remining time:
21/10 Wednesday
- Complete the Soles
- Finalize sound
- Buy light and other stuff
- Make sure that everyone has control over the blogg posts that needs to be made for Thursday
- Mount the stuff to the sealing, lamps and discoball
- Speakers
22/10 Thursday
- Finalize blog
- Finalize the article
- Testing
- Exhibition logos and banners
23/10 Friday
- Exhibition presentations at 10AM
To be continued.
/Linnéa Becker
- Finalize the article
- Testing
- Exhibition logos and banners
23/10 Friday
- Exhibition presentations at 10AM
To be continued.
/Linnéa Becker
0 kommentarer:
Skicka en kommentar